10 OCT 2008 |
|
MONTANA DEPARTMENT OF TRANSPORTATION |
|
|
|
|
|
|
Report Name: |
|
RRSR0031 |
|
|
|
ROAD CONSTRUCTION REPORT |
|
|
|
|
|
|
For information please contact: |
|
|
|
|
Brandi Hamilton (406) 444-0468 |
|
|
|
|
|
This is a report of road construction on Montana's interstates and major highways. This report includes information available at the time of preparation.
|
|
|
|
|
|
|
|
|
|
This report is available by telephone at 511 or 1-800-226-7623. For the hearing impaired, call the TTY number 1-800-335-7592.
|
|
|
|
|
|
|
|
|
|
TRAFFIC FINES DOUBLE in highway work zones. The law also set fines and jail sentences for reckless endangerment of highway workers.
|
|
|
|
|
|
|
|
|
|
MINOR DELAYS (up to ten minutes) can be expected through these projects with anything over ten minutes being noted in the description. Watch for equipment, flaggers, and workers along the road. Expect reduced speed limits.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-115 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Intersection with I-115 to Platinum (Excelsior Avenue in Butte). Striping work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-15 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Approximately 14 miles north of Dillion through Glen to Melrose. Striping work in progress. Waiting for final striping.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Main Street |
|
Main Street in Butte. Bridge work in progress. Expect detour.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-15 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: South of Helena near Montana City north approximately 2 miles. Miscellaneous work in progress. The interchange and frontage road are now open to the traveling public. The contractor will continue to do work that is off the roadway. There may be some traffic control for future work.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
North Montana Avenue
|
|
In Helena - from Enterprise to Custer Avenue. Miscellaneous work in progress. Expect fresh oil, loose gravel.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-15 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Near Ulm continuing north of Great Falls to the Emerson Junction. Miscellaneous work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-15 |
|
This project has been completed. Sun River Bridge near Great Falls. Bridge work in progress. Bridge inspections will be taking place but there is no longer a width restriction required.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Vaughn Road - Great Falls
|
|
Work on this project is temporarily suspended. When work resumes please expect the following: From Central West to Northwest Bypass. Miscellaneous work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-90 |
|
East of Henderson. Bridge work in progress. There is a width restriction of 12 feet. Expect detour, reduced speed to 55 mph, single lane closures, motorcycles consider another route. There is a 12 foot width restriction and a 100 foot length restricton for eastbound traffic and westbound traffic. Triples are excluded from the length restriction. Over width loads and over length loads will be piloted through the project on Monday through Thursday from 8:00 am to 10:00 am. To coordinate piloting please contact Jeff Hollenback, Western Traffic Control at 406-531-9914.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-90 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: One mile west of the Clinton Interchange to 9 miles east of the Rock Creek Interchange. Striping work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-90 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Continental Drive, Pipestone and Whitehall Interchanges. Sign installation work in progress. Expect reduced speed to 35 mph, single lane traffic, single lane closures. Installation of road closure gates in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-90 |
|
Seven miles east of Bozeman to 17.5 miles east. Crack sealing work in progress. Expect reduced speed to 35 mph, single lane traffic, single lane closures.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-90 |
|
Jackson Creek Interchange between Bozeman and Livingston. Bridge work in progress. There is a width restriction of 15 feet. Expect detour, reduced speed varying from 35 to 65 mph, single lane traffic. Two-way traffic on the east bound lane from milemaker 324 to milemarker 330, west bound lanes will be closed to traffic from milemarker 324 to 329.5. There will be a 15 foot width restriction in place west bound and a 20 foot width restriction east bound. Interchange will cause one lane traffic on the frontage road.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-90 |
|
Springdale Interchange to 6 miles east. Paving work in progress. Expect reduced speed to 45 mph. Paving on the ramps only.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Old Highway 10
|
|
From Park City east to Gulf Course Road. Bridge work in progress. There is a width restriction of 12 feet. Expect reduced speed to 35 mph, single lane traffic, traffic controlled by signal lights.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
West Billings - King Avenue
|
|
From 20th Street to Midland Road. Miscellaneous work in progress. Replacing damaged guardrail sections. Work will not affect traffic.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-90 |
|
Lodge Grass Interchange continuing west to the Garryowen Interchange. Paving work in progress. There is a width restriction of 16 feet. Expect single lane traffic.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-90 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: One mile east of Lodge Grass Interchange to one mile west of Wyola Interchange. Miscellaneous work in progress. No impacts to traffic.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-94 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: East of Pompey's Pillar to Custer Interchange. Miscellaneous work in progress. Expect fresh oil.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-94 |
|
Hodges Interchange - Exit 231. Miscellaneous work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-1 |
|
Between Georgetown Lake and Philipsburg. Miscellaneous work in progress. Expect delays of 10 to 60 minutes, reduced speed to 35 mph, single lane traffic. Delays can be expected between the hours of 7:30 a.m. and 6:00 p.m., Monday through Friday, excluding holidays. During rock scaling or removal there may be road closures up to one hour. If you have problems with the project after hours or on the weekends, please contact Johnny at (805) 797-5155 or email brian@aisconstruction.com or contact Cindy at (406) 241-2241.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-16 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: From the I-94 Interchange extending northeast approximately 18 miles. Chip sealing work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-200 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Idaho Line East. Miscellaneous work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-200 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: One miles west of Thompson Falls. Sign installation work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-200 |
|
Milltown - Blackfoot River Bridge. Bridge work in progress. There is a width restriction of 12 feet. Expect detour, reduced speed to 25 mph. Loads over 12 feet wide traveling on MT-200 will be detoured to the Clinton Interchange and onto S-210. The Turah Interchange cannot be used because of height restrictions. There will be intermittent road closures on S-210 from Bonner to Turah. Travelers will be detoured onto Rustic Road. Loads over 13 feet 9 inches tall, loads over 15 feet wide, and loads over 95 feet long will need need to call 406-728-9370 to arrange for piloting.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-200 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: East of Bonner at the Johnsrud Park Road. Striping work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-200 |
|
Southeast of Ovando at Arrastra Creek. Bridge work in progress. Expect detour. Detour brige is being used at this time.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-200 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Approximately 6 miles east of the junction with S-279 continuing east 9 miles. Miscellaneous work in progress. Only seal and cover operations remain. No work on project until May 2009.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-200 |
|
Five miles west of the Junction with S-462 continuing 11 miles east. Miscellaneous work in progress. There is a width restriction of 12 feet. Expect delays up to 15 minutes, reduced speed to 35 mph, single lane traffic, single lane closures. Culvert and miscellaneous activities taking place starting October 6, 2008.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-200 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Fifteen miles west of Brockway. Guardrail work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-200 |
|
Circle to Lambert. Culvert installation work in progress. Expect reduced speed to 35 mph.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-200 |
|
Seven miles west of Richey to 23 miles east. Crack sealing work in progress. Expect reduced speed to 35 mph, single lane traffic, single lane closures.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-41 |
|
Twin Bridges. Bridge work in progress. Expect reduced speed to 35 mph, single lane closures.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-59 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: 2.2 miles north of Miles City continuing north approximately 11 miles. Chip sealing work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-59 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: 18 to 32 miles north of Miles City. Miscellaneous work in progress. Project inactive until final inspection.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-69 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: 10 miles northeast of Whitehall. Striping work in progress. Seeding also in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-72 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Wyoming Line to Belfry. Miscellaneous work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-78 |
|
Approximately 5 miles west of intersection with US 212. Seeding work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-83 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: North and south of Condon. Sign installation work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MT-86 Bridger Canyon Road
|
|
Work on this project is temporarily suspended. When work resumes please expect the following: Approximately 19 miles north of Bozeman near Battle Ridge Campground. Miscellaneous work in progress. Expect delays of 10 to 20 minutes, reduced speed varying from 25 to 35 mph, single lane traffic.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-206 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: One and a half miles north of the Junction with MT-35. Miscellaneous work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-228 |
|
Southwest of Highwood. Bridge work in progress. Expect detour, reduced speed to 35 mph. Traffic using detour bridge.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-239 |
|
Utica to Hobson. Fencing work in progress. Fencing and sign installation - no effect on travelers.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-251 |
|
Approximately 23 miles northeast of Poplar. Seeding work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-253 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: 4 miles north of Terry - Cherry Creek. Chip sealing work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-253 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: 23 miles north of Terry. Miscellaneous work in progress. Actual mileposts are 23 to 36.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-254 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: From the junction with MT-16 extending northwest for 10 miles. Chip sealing work in progress. There will be 24 hour pilot cars.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-261 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: South of Sidney between milepost 26 and 30.. Paving work in progress. Seeding work is scheduled to begin Wednesday, October 15, 2008.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-271 |
|
Approximately 8 miles north of the Junction with I-90. Reconstruction work in progress. Expect reduced speed to 35 mph, pilot cars, gravel surface, single lane traffic. Excavation work in progress between milemarkers 7.2 and 17.8.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-279 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Junction with MT-200 to Flesher Pass. Miscellaneous work in progress. Only seal and cover operations remain. No work on project until May 2009.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-313 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: In Hardin - southwest of the intersection of North Center Ave & West 3rd. Striping work in progress. Expect fresh oil, loose gravel, reduced speed to 25 mph.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-313 |
|
This project has been completed. 22 miles south of Hardin to St. Xavier. Striping work in progress. Expect fresh paint.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-317 |
|
Intersection of Conrad Drive and Willow Glen. Sign installation work in progress. Expect single lane traffic. Safety project, placing chevron signs and a flashing signal.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-323 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: From 21 to 35 miles south of Ekalaka. Chip sealing work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-324 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: From 13 miles west continuing to Clark Canyon Dam. Striping work in progress. Waiting for final striping.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-332 |
|
South of the Junction with MT-59. Culvert installation work in progress. Expect detour, loose gravel, reduced speed to 35 mph, gravel surface.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-354 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: South of Polson. Striping work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-454 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Helena - south from Last Chance Gulch to Unionville. Overlay work in progress. Expect delays up to 15 minutes, pilot cars.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-463 |
|
Approximately 6 miles southwest of Lodge Grass continuing 8.5 miles. Striping work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-484 |
|
Four miles east of Ashland continuing south 20 miles. Miscellaneous work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-487 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: North of Whitefish approximately 4 miles from traffic light on US-93. Landscaping work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-517 |
|
Junction with MT-16 continuing 12 miles east. Crack sealing work in progress. Expect delays of 10 to 15 minutes, reduced speed to 35 mph, single lane traffic, single lane closures.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-528 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Junction with MT-13 continuing 15 miles west. Crack sealing work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S-532 King Avenue - 72nd Street
|
|
Work on this project is temporarily suspended. When work resumes please expect the following: Approximately 9 miles west of Billings. Striping work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Old US-10 in Missoula
|
|
Intersection of West Broadway and Palmer Street. Signal installation work in progress. Expect reduced speed to 35 mph. Sidewalks and bicycle lanes are closed at the intersection.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-12 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Garrison to the Dana Bridge. Striping work in progress. Waiting for final striping.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-12 |
|
Six to seven miles east of Garrison. Bridge work in progress. Expect reduced speed varying from 35 to 45 mph, single lane traffic.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-12 |
|
MacDonald Pass. Paving work in progress. Expect single lane traffic. Paving ditches onn west bound lanes.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-12 |
|
Approximately 20 to 30 miles east of Melstone. Chip sealing work in progress. Expect delays of 15 to 20 minutes, fresh oil, loose gravel, reduced speed to 35 mph, pilot cars, single lane traffic.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-191 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Yellowstone to Big Sky. Striping work in progress. Waiting for final striping.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-191 |
|
Yellowstone Park Boundary to south of the Junction with MT-64 at Big Sky. Grading work in progress. There is a width restriction of 10 feet. Expect delays of 10 to 15 minutes, reduced speed to 35 mph, pilot cars, single lane traffic. Working both night and day shifts. Possible paving activities. Truck traffic will not be allowed on US 191 until the end of construction. Local delivery traffic will not be affected.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
www.mdt.mt.gov/us191
|
|
|
|
|
|
|
|
|
|
US-191 |
|
1st Ave Lewistown. Signal installation work in progress. Expect single lane closures. Signal and sign installation may cause short lane closures on First Avenue and Boulevard Street in Lewistown.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-191 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: North and south of Missouri River - Fred Robinson Bridge. Crack sealing work in progress. Expect fresh oil, reduced speed to 35 mph, single lane traffic, single lane closures.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-191 |
|
Approximately 3, 13, 20, and 33 miles south of Malta. Miscellaneous work in progress. Expect detour, reduced speed to 35 mph, gravel surface, rough roadway surface.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-2 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Northeast of Kalispell - Reserve Drive to Glacier International Airport. Striping work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-2 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Hill Top Road 1 mile south west of Columbia Falls. Sign installation work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-2 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Approximately 5 miles east of Essex. Shoulder work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-2 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Approximately 10 miles east of Essex. Surveying work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-2 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: East Glacier - west. Miscellaneous work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-2 |
|
Various locations - in Browning, East Glacier, Essex, West Glacier, and Columbia Falls. Sign installation work in progress. Variable Message Signs will be placed in these locations. Actual ending milepost is 221.5.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-2 |
|
From Dodson to 4 miles east. Seeding work in progress. |
|
|
|
|
|
|
|
|
|
|
|
US-212 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: East of the Battlefield. Striping work in progress. Expect reduced speed to 35 mph, single lane closures. Winter shutdown.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-212 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Beginning in Ashland and running 8 miles West. Striping work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-212 |
|
From 3 to 11 miles west of Broadus. Paving work in progress. Expect delays up to 15 minutes, fresh oil, reduced speed to 35 mph, pilot cars, gravel surface, rough roadway surface. Motorcycles should consider an alternate route. Paving to start October 13 or 14.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-287 |
|
Hebgen Lake. Striping work in progress. Striping in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-287 |
|
Two miles west of Three Forks. Bridge work in progress. Expect reduced speed to 35 mph, single lane closures.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-287 |
|
Approximately 10 miles north of Bowman's Corner to Augusta. Reconstruction work in progress. Expect delays up to 15 minutes, detour, loose gravel, reduced speed to 35 mph, pilot cars, gravel surface, rough roadway surface, single lane traffic. Motorcycles should consider an alternate route due to detours and loose gravel. Gravel section is approximately 5-6 miles in length.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-89 |
|
Top of Kings Hill Pass continuing north 24.7 miles. Miscellaneous work in progress. Work is substanially complete.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US-89 |
|
Work on this project is temporarily suspended. When work resumes please expect the following: Great Falls - at the intersection of 57th Street South west along 10th Avenue South. Miscellaneous work in progress. One sign remains to be installed-waiting for parts.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Overlook Drive - Great Falls
|
|
Beginning east of BN Railroad tracks and ending north of 10th Ave South. Bridge work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NW Bypass - Great Falls
|
|
Work on this project is temporarily suspended. When work resumes please expect the following: From 3rd Street to 9th Street. Miscellaneous work in progress.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2nd Avenue South - Great Falls
|
|
7th Street to 9th Street. Reconstruction work in progress. Expect detour, single lane traffic, road closure, intersection work. This project is also tied to 2nd Ave N from 10th St to 15th St. 2nd Ave N is open from 14th St to Park Drive. All side streets are open to traffic. Access to the 2nd Ave N businesses will be maintained at all times. 9th St from 3rd Ave S to Central Ave is closed. 2nd Ave S is closed from 7th St to 9th St with north and south cross streets open. 14th and 15th St are open to traffic.
|
|
|
|
|
|
|
|
|
|
|